Sunday, May 13, 2012
Architectural Program
Team Wildcat was conscripted to provide the area of Jefferson Township, in Northern Wells County, with a new commercial building that would be a viable contribution to the enjoyment of the community as a whole. Team Wildcat must design a building or group of buildings with the total area to be retained to 15,000 square feet, or less. The site is meant to be a place of social commerce, while still meeting the 2009 IBC code requirements presented for it. To begin the project, Team Wildcat gathered together to brainstorm ideas for possibilities of a commercial building. Ideas ranged from an internet cafe to an indoor paintball arena. Our team then used a decision matrix to compare the ideas to each other and to the property as it is. This helped Team Wildcat to get a broader view of the project and how the ideas stack up to each other on an objective scale. Based on the decision matrix, the constraints of the project, and the general consensus of Team Wildcat as a whole, we chose to build a YMCA on the plot of land that we were given. Our team met once again to design a conceptual Gantt chart to divide the work and assign to the members of the team. Risa was the primary building designer, Brinson was the landscape architect and parking lot designer, and Max dealt with the paper work. As we continued our individual work on the project, team members would converse about different aspects of the project to be up-to-date on the progress of the project, and make sure to adhere to any changes that were made.
Monday, May 7, 2012
Gantt Chart
Day 1 | Day 2 | Day 3 | Day 4 | Day 5 | Day 6 | Day 7 | Day 8 | Day 9 | Day 10 | Day 11 | Day 12 | Day 13 | Day 14 | Day 15 | Day 16 | Day 17 | Day 18 | Day 19 | Day 20 | Day 21 | Day 22 | Day 23 | Day 24 | Day 25 | |
Define the Problem and Offer Solutions | |||||||||||||||||||||||||
Do a Decision Matrix | |||||||||||||||||||||||||
Choose an Appropriate Solution | |||||||||||||||||||||||||
Consult Clientele About Project Direction | |||||||||||||||||||||||||
Research Code Requirements for the Project | |||||||||||||||||||||||||
Find Building Placement On-Site | |||||||||||||||||||||||||
Preliminary Building Design | Room Placement and Building Specifics | Placement of Furniture in Building | Add Water and Electric Lines | Merge Building onto Site | Plan A Presentation for The Project | Present the project | |||||||||||||||||||
Coding
Codes Requirements
Applicable Codes
IBC 2009
Zoning
From the Wells County GIS, the project site is located in a farm zone. As a result, we have filed re-zoning papers with the county at http://wellscounty.org/forms.htm.
200 people for the 10,000 square feet reserved for exercise purposes. 50 people for the meeting rooms. A total of 250 people maximum.
(Section 1001, Table 1004.1.1)
Applicable Codes
IBC 2009
Zoning
From the Wells County GIS, the project site is located in a farm zone. As a result, we have filed re-zoning papers with the county at http://wellscounty.org/forms.htm.
ADA requirements
ADA
accommodations will adhere to chapter 11 of the IBC 2009, especially
relating to the entrance ways and restroom facilities. In general, any
area of the building must be accessible by those who are constricted to
travel by the method of wheels (for example, ramps or elevators must be
used in place of stairs). All entrances must be accessible by those who
are handicapped, and entrances and exits into the building itself must
be expecially considered as they must be able to open and close under
their own power.
Occupancy classification and description
It is an assembly subgroup 3 building, or A-3 for short. These buildings are intended for people to assemble in them for religious, civic, or social functions. The third subgroup contains the miscellaneous buildings, whose main purpose does not constitute fixed seating or revolve around food or drink consumption. A YMCA fits this agenda as it does not have fixed seating and it is not a bar or restaurant. (Section 303)
It is an assembly subgroup 3 building, or A-3 for short. These buildings are intended for people to assemble in them for religious, civic, or social functions. The third subgroup contains the miscellaneous buildings, whose main purpose does not constitute fixed seating or revolve around food or drink consumption. A YMCA fits this agenda as it does not have fixed seating and it is not a bar or restaurant. (Section 303)
Type of construction
Based on the type of building, we will be building it out of concrete and glass.
Maximum building size: maximum area, maximum height,maximum number of stories
Based
on the building classification and constraints, our building will be 15
feet high, and 1 story.. Since we're building a type A-3 building and
using type I construction materials, we could build the building an
unlimited number of height and stories.
(Sections 503 and Chapter 6)
Occupancy load (guess how many people) (Sections 503 and Chapter 6)
200 people for the 10,000 square feet reserved for exercise purposes. 50 people for the meeting rooms. A total of 250 people maximum.
(Section 1001, Table 1004.1.1)
Parking requirements
Adhering to ADA codes and occupancy requirements, we will have 50 parking spaces, with 2 additional handicap parking spaces. (Section 1106)4.1.6
Introduction
Once you have thoroughly researched the site, you can
evaluate the information to decide whether or not the site will provide a good
fit for a proposed project. This evaluation is called a viability analysis. If
you are developing a specific project, it is often a good idea to perform a
viability analysis on several sites to compare the positive and negative aspects
of each before choosing a final site location. If you are developing a specific
site, you may wish to compare several potential development options in order to
maximize the effective use potential.
In order for a property to be viable, it must meet the
following criteria:
· Project is legally
allowable
· Project is physically
possible
· Project is
financially feasible
· Project is good
choice for community
In this activity your design team will review several
commercial development options for the site. You will review all of the
information gathered about your project site and your proposed development
options and consider the viability of each option. Finally you will present your
recommendation for a commercial development on the project site.
Equipment
· Engineering
notebook
· Pencil
· Computer with
Internet access
· Decision
matrix
· Site plan
· Project 4.1.10
Commercial Project Viability Rubric
Procedure
1.
Make a list of at least three commercial or institution
development facilities that you have considered for the site. Your list may
include some of the following facility types.
Paintball Arena
Internet Cafe-Recreational Center
Go-Kart Track
Fishing Pond/Pool
YMCA
2.
Review applicable codes, regulations, and zoning. Are all of the
commercial or institutional facilities on your list legally allowable? Is a
variance or zoning change necessary in order to obtain a building permit? Note
that variances and zoning changes are routinely requested and should not
automatically eliminate a commercial activity at this point in project planning.
However, if the proposed activity will conflict with surrounding uses, a
variance or zoning change may not be granted.
Yes, all of our proposed plans are allowable, and the zoning had to be
changed from a farm zone to a more commercialized zone required to build
a building of commerce.
3.
Eliminate project ideas from the list that appear to conflict with codes,
regulations, and/or zoning and for which you anticipate a variance or zoning
change is unlikely. Your teacher will act as the zoning board in order to
approve any zoning variance requests. Select alternate potential commercial
projects that you consider to be legally allowed or for which you anticipate a
variance or zoning change is feasible (per your teacher). Provide at least three
potential project ideas.
Any establishment that is serving alcoholic beverages or has exotic
dancers will not be permitted in this location, due to its close
proximity to a school zone.
4.
Make a list of all of the important physical site characteristics that
should be considered when choosing a type of facility to be constructed on the
site. Examples include availability of utilities, environmental concerns, size
and shape of property, location of floodplains and wetlands, etc.
This property is a rectangular shape, but the narrower portion of the
geometry is road-front property, which does pose some issues when
designing buildings, as retails buildings usually adhere to a longer
road-front to allow more parking spaces that are closer to the entrance
of the building. Water runoff shouldn't be a problem; there is a pond
on the property. The ground is flat, which should aid in construction
of the building, and the fifteen thousand square foot maximum for
building size will easily work inside the constrains of the property.
The pond is not in the center of the property, so there is a large
amount of continuous space to place a building or two.
5.
Approximate the square footage for each potential project. Then
approximate the cost of the facility using the RS Means Quick Cost Estimator at
http://www.rsmeans.com/calculator/index.asp.
This site requires registration, but is free. If a specific facility is not
listed, choose the facility that most closely resembles the project for which
you are creating the estimate.
· Record the Construction
Type used for each project estimate.
· Record the estimated
Contractor’s Overhead & Profit, Architectural Fees, and Total Building Cost
for low, medium, and high cost ranges for each project estimate.
· Calculate the cost per
square foot for the medium total building cost for each facility.
It is
important to understand that the cost of construction alone cannot determine
financial feasibility. The anticipated return on the investment must also be
considered; however, we will not investigate investment return potential
here.
The go-kart facility would probably have to be approximately 7,500 to
10,000 square feet to accomadate a maintenance center, ticket station,
and management center. The paintball facility would want to be a full
15,000 square feet if it was an indoor facility, otherwise a smaller
area would be needed for housing equipment and administration, such as
5,000 square feet. An internet cafe could be housed in a 5,000 square
foot building. A pool and fishing facility for the pond would be around
10,000 square feet, for showers, lockers, fishing gear, maintenance,
and administration centers. A YMCA center would probably be 15,000
square feet for the exercise facilities, meeting rooms, and other
portions that constitute a YMCA.
Based on the results of our decision matrix and our group's consensus, we chose the YMCA facility as the most feasible and effective commercial project for Wells County. 15,000 square feet appears to be a very good number for the area of a YMCA complex (without a swimming pool) and our community does not have very many facilities and activities directed towards young people. Also, the close proximity of the lot to a school further enhances the accessibility of the building to the targeted age group. Lastly, the decision matrix indicated this project idea to be the best by it getting the highest rating.
Design Development Calculations
Water Pressure Calculations
Static Head = 150 feetC = 100
Q = 110 gpm
L = 20,000 ft
D = 10.00 in
Dynamic Flow Loss = 3.39 ft
Dynamic Head = 150 ft - 3.39 ft = 146.61 ft
Actual Pressure = 63.47psi
Heat Loss/Gain Calculations
Q = 1/15(15,000ft^2)(70 F) = 52,500 Btu/hrStructural Design Calculations
Fy = 50,000 psi
54 Foot Beam
500 lb/ft Uniform Load
Reaction Forces at A and B = 13,500 lb
Moment Maximum Force = 182,250 lb*ft
Required Nominal Moment = Maximum Moment(1.67) = 182,250lb*ft(1.67) = 305,000 lb*ft
Zx = Mn/Fy = 305,000 lb*ft / 50,000 lb*ft = 6.1 inches cubed
W10X12 Beam Selected
Required Sheer Strength = Reaction A * 1.5 = 13,500lb(1.5) = 20,250 lb
Actual Sheer Strength = .6(Fy)d(tw) = .6(50,000psi)9.87"(.190") = 56,259lb, So the sheer strength is good
L/240 = Maximum Deflection = 20 ft(12in)(There are columns supporting the beams at the walls of the hallway, effectively cutting the length of the beam for deflection)/240 = 1in Deflection
W10X12 is 1.1 inch deflection, so W10X15 has .9 inch deflection, so W10X15 was selected for use.